Need the area in blue in the image removed and two 24x36-in footings dug. The boarder is a separate pour from the main patio and will come out easy. Footings will be 24-in sono tubes with rebar. I'll provide the tubes and rebar . Then need to pour the footings. pour back the excavated border. needs to be trowled flat to be painted later. Concrete is about a yard and a half. Preferences to use someone who has a mini skid steer with attachments or light excavator. Easy access to the patio from a 10-ft wide driveway down the side of the house.