NOTE: This space is priced by Power (kW) or Per Rack, not per square foot. Ignore the $1 Craigslist placeholder.
116 kW 3-phase 208, 96 kW single-phase 240v power available 3-hour drive from Seattle.
Perfect for crypto-miners, startups with latency-agnostic workloads like AI/ML, VFX/rendering, etc
We are open to leasing per rack, per kW, or the entire capacity to a single tenant.
Reply to this ad with your power requirements (in kW) and hardware footprint to discuss pricing.