compensation:Aproximately 7 hours for complete job. It is a two phase operation at this point. $65-? per/hour depending on experience.
QR Code Link to This Post
Please be completely familiar with each step of high pressure pump removal. Please be local, and close to Northgate Seattle, or willing to drive. Must have all tools. First step: getting familiar with truck, removing pump, with all eight steel lines attached. New pump will arrive and lines will get switched over, blown out with brake cleaner, and reattached on a work bench.
Installation into truck is reverse of removal.
Please indicate your experince level with this type of repair if replying.